Here you can see the progress of the current and future locations of ProTom Proton Therapy Facilities. Check back to see the latest developments.
 

  << Back to Previous Page



MGH Proton Therapy Center

  • Cable Trays, Electrical Conduits and UPS Panel Get Mounted In MGH Equipment Vault
  • ProTom prepares equipment vault for Radiance 330 installation at Massachusetts General Hospital
  • MGH Synchrtotron at ProTom Test and Assembly Facility
  • MGH Synchrotron at ProTom Test and Assembly Facility
  • Ben Clasie Ph.D. Observes MGH Synchrotron Installation at ProTom Assembly and Test Facility
  • ProTom and medPhoton-Leoni Staff Assess Installation Site for Cone Beam CT and PPS equipment
  • Staff Drilling at ProTom Assembly Facility
  • MGH Scanning Hardware at ProTom Assemly and Test Facility
  • ProTom's MGH Gantry Assembly in Preparation for Factory Acceptance Testing
  • ProTom's MGH Gantry Assembly in Preparation for Factory Acceptance Testing
  • ProTom's MGH Gantry Assembly in Preparation for Factory Acceptance Testing
  • ProTom's MGH Gantry Assembly in Preparation for Factory Acceptance Testing
  • Cable Install, Gantry Beamline
  • Full MGH Gantry Assembly
  • Factory Tuning,Testing of RFQ Injector
  • MGH Robotic Patient Positioner Under Factory Acceptance Testing - 10.11.15
  • MGH Custom RFQ Arrives At ProTom Assembly and Test Facility 10.16.15
  • ProTom Team Checking RFQ Flow Rates 10.19.15
  • MGH RFQ Assembly Underway at ProTom Test Facility 10.20.15
  • MGH RFQ Assembled at Test Facility 10.21.15
  • MGH Team, ProTom Leadership, and Board Representatives See New MGH Main Power Supply at ProTom Assem
  • ProTom Staff Uncrates MGH Main Power Supply at ProTom Assembly Plant 10.21.15
  • ProTom Staff Unwraps the MGH Main Power Supply at ProTom Assembly Plant 10.21.15
  • Disassembled Gantry Prepared For Delivery To Mgh December 28 2015
  • Shaugnessey Rigging Tests Custom Elevator Hoist In Preparation For Protom Gantry Installation 2016-01-02
  • November 24, 2015_Protom Assembly Facility Rfq Intergration With Synchrotron Complete
  • First Gantry Adjuster Plate Installed At Mgh By Forte And Shaughnessey 2016-01-13